I am an Engineer looking for General Engineering Information
Answer:
- For branch submittal requirements, please click here or for more information please contact our branch services section at 513-591-7837 or email branch.services@gcww.cincinnati-oh.gov
- For Subdivision/Private development submittal requirements, please contact our development section at 513-591-7877 or email development@gcww.cincinnati-oh.gov
- For GCWW capital improvement projects please contact our design section at 513-591-7978
Answer:
- A separation of 18” vertically must be maintained between all water service branches and water mains from all other utilities, structures, etc.
- A separation of 5’ horizontally must be maintained between all water service branches and water mains from all other utilities, structures etc.
For more information on separation requirements please contact our water main inspection section at 513-591-7851
Answer: Flow test needed for branch or water main extension purposes must be conducted by a private contractor and must be scheduled with the GCWW valve room in advance at 513-591-7909. Please contact our valve room at phone# to schedule a flow test.
Answer: Please click here to download our current standard drawings.
Answer: GCWW Rules and Regulations are a set of rules and guidelines used to direct the operation and maintenance of our water system. Click here to download the Rules and Regulations.
Answer: GCWW uses our standard drawings, rules & regulations, and the supplement to ODOT construction and material specification as a spec guide for water main projects. Please click here to view our construction specification documents.
Answer: Rainwater harvesting specifications can be found here.