Kellogg Avenue/River Road Rehabilitation

Kellogg Avenue/River Road Rehabilitation

As part of the City of Cincinnati’s ongoing investment in the neighborhoods of California and Sayler Park, the Department of Transportation and Engineering is conducting street rehabilitation work on Kellogg Avenue and River Road.

The City’s contractor, the John R. Jurgensen Co., will be conducting the following work: the repairs of curbs, sidewalks and driveways, as necessary; the repair of road base; and the grinding and paving of the roadway.

On River Road from Dart Street to the corporation line, one twelve foot (12’) lane in each direction will be open and available to traffic at all times. This will allow the contractor to close half the roadway, while maintaining one lane of traffic in each direction on the other half.

On Kellogg Avenue from Salem Road to Sutton Avenue, all westbound lanes will remain open from 6 to 9 a.m., Monday through Friday. All eastbound lanes will remain open from 4 to 6 p.m., Monday through Friday.  At all other times, at least one 12-foot lane will be maintained in each direction.

Access for emergency vehicles, businesses and residents shall be maintained at all times.

Drivers are encouraged to reduce their speed and use caution when approaching the construction area.